Perhaps one of the most powerful aspects of WirelessHART (IEC 62591) is the ability to reduce the project timeline with faster field commissioning.    Traditional instrumentation and controls requires pulling a 2-wire loop, landing it in a marshaling cabinet and terminating it in the I/O rack.  This is done for every instrument in the field.  With Wireless HART devices all you need to do is connect the gateway to your host via ethernet or MODBUS and drag and drop the instrument to the gateway via calibration software.  Now that’s fast!

Tagged with:
 

Leave a Reply

%d bloggers like this: